Optimizing Drilling Schedules with Microsoft Project Server 2010 (Part 2) – Leveling the Rig Schedule
This is part two in our series on optimizing drilling schedules with Microsoft Project Server 2010. In our previous post, we discussed how this series is designed to be a case study in managing resource constrained projects. In this case, our goal is to optimize a rig drilling schedule across multiple oil wells and then…